Sample professional audit / Chennai

A report that makes
the next step obvious.

Sample project: 2BHK apartment, Adyar
Audit date: 17 August 2024 · Auditor: A. Ramanathan

Example document / CMI–24–0817

Handover readiness

74out of 100
ready to close

The home is progressing well, but three major items should be resolved before final payment. The evidence below is organised for a contractor walk-through — not hidden in a paragraph.

Critical priorities01
Major priorities03
Minor observations11
Checks completed517
Selected findings

Nothing vague.
Nothing buried.

Every finding carries a priority, a location, a photograph and a next action. This is a sample of the detail you receive after your visit.

CRITICALF–008 / ELECTRICAL

Loose termination at kitchen appliance point

Socket plate is not flush and termination is not adequately secured. Do not close the wall panel until corrected and re-tested.

PHOTO 03RECTIFY NOW
MAJORF–042 / KITCHEN

Uneven shutter gap at tall unit

Right-side gap varies from 2mm to 6mm across the run. Adjust before final polish; uneven reveals will become more visible under task lighting.

PHOTO 07RECTIFY BEFORE HANDOVER
MINORF–119 / MASTER BEDROOM

Paint touch-up around wardrobe return

Small roller mark and exposed edge noted at the wardrobe return. Cosmetic, but visible under the window light.

PHOTO 19ADD TO SNAG LIST
The full report continues room by room.Kitchen, bedrooms, living, utility, bathrooms and handover readiness — all documented in the same format.